Illustration of a coverage matrix for CSA N299.3, pressure piping fabrication: 96 clauses covered, 31 partial, 15 missing. Five clause rows are shown. 4.2 quality program documentation and 4.4 document control are covered by an existing procedure. 4.9 nonconformance and corrective action and 4.11 procurement and supplier control are partial, each with a delta drafted. 4.14 internal audit is missing, drafted from a template. The panel is headed as run by Forged and walked through with you.
Coverage
CSA N299.3 · Pressure piping fabrication
96 covered
31 partial
15 missing
4.2
Quality program documentation
Covered
Matches existing procedure
4.4
Document control
Covered
Matches existing procedure
4.9
Nonconformance and corrective action
Partial
lewis drafted a delta
4.11
Procurement and supplier control
Partial
lewis drafted a delta
4.14
Internal audit
Missing
Drafted from template